SUPPORT

Heebol support

Posts: Steel Posts→Posts cutting→Post Washing→Put the powder into Mold→Posts Polishing→Posts Heating→Powder coating→Installation and Debugging→Intall Clamps→Packing

heebol steel post
Steel Posts
heebol steel post
Steel Posts
posts wareshouse
Posts Wareshouse
post cutting
Posts Cutting
post washing
Post Washing
Put The Powder Into Mold
Posts Polishing
Posts Polishing
Posts Heating
Posts Heating
powder coating
Powder Coating
installation and debugging
Installation and Debugging
Intall Clamps
Intall Clamps
heebol packing
Packing

Certification

CPSIA TEST REPORT

Packing/Loading

Packing: Cotton With PP Film, Bubble Bag With PP Film Customized Packing is available

Delivery Time: 20-25days after receiving the deposit

heebol faq page
  • 1. Minimum Order Quantity: 10set
  • 2. Lead time: around 10-20days
  • 3. Port: Ningbo or shanghai
  • 4. Payment Terms: T/T(30% deposit in advance, the balance before the shipment)
  • 5. Warranty: 1 year
  • 6. OEM/ODM: Acceptable
Scroll to Top