Posts: Steel Posts→Posts cutting→Post Washing→Put the powder into Mold→Posts Polishing→Posts Heating→Powder coating→Installation and Debugging→Intall Clamps→Packing
Steel Posts
Steel Posts
Posts Wareshouse
Posts Cutting
Post Washing
Put The Powder Into Mold
Posts Polishing
Posts Heating
Powder Coating
Installation and Debugging
Intall Clamps
Packing
Certification
CPSIA TEST REPORT
Packing/Loading
Packing: Cotton With PP Film, Bubble Bag With PP Film Customized Packing is available
Delivery Time: 20-25days after receiving the deposit
1. Minimum Order Quantity: 10set
2. Lead time: around 10-20days
3. Port: Ningbo or shanghai
4. Payment Terms: T/T(30% deposit in advance, the balance before the shipment)